F
24
c/flooring-installersjoelburnsjoelburns29d agoProlific Poster

A 1970s bathroom floor tile job turned into a two day puzzle

I pulled up the old vinyl in a house from 1978 and found the subfloor was a patchwork of three different plywood grades, none of them level. It took me a full day just to map and plane it all down before I could even think about the new tile. What's the longest a simple prep job has ever set you back?
3 comments

Log in to join the discussion

Log In
3 Comments
hugo319
hugo31929d ago
Mapping that patchwork subfloor sounds brutal lol
5
terry835
terry83529d ago
My last house had three different subfloor types, it was a nightmare.
0
caseythompson
Sounds like a DIY horror movie.
4