Just realized a client's 'simple' floor repair turned into a full demo after I pulled up a corner
I was at a job in Tacoma last month, fixing a small water spot on some laminate. The homeowner said it was just that one board. When I lifted the edge, I found black mold covering about 60 square feet of the subfloor underneath. Now I'm stuck between two minds. One side says you have to stop, show the client, and quote the full, proper fix, even if it kills the small job. The other side says you just quietly put the board back, finish the patch, and walk away from the bigger problem you found. Where do you guys draw the line on stuff you weren't hired to find?